As promised, we got a LOT done this weekend and we are finally starting to see a 'light at the end of the tunnel.' With the help of Don, Eric's Dad in town from
Richland WA, we accomplished our goals for the weekend and put in upwards of 16-20 hours.
#1: Don installed the new french doors connecting the living room and third/front bedroom. This was quite a project, as the doors were not
pre-hung. Don framed out the door, and hung the door 'from scratch'. They look great. Here are the steps:
a) frame out the door.

b) make all of the measurements and install the frames (a lot more work than I am describing here!)

c) make any last adjustments (
ie: for the floor not being straight, etc).

d) - hang the doors! Don is a pro, so they hung right (about) the first time. Here is Eric, excited.

e) install drywall around the door opening:

#2 Get as much drywall prepped as possible (
ie hang, mud, sand & repeat x3).
We finished
most of the house, although there is still a bit to go. Here is Christina working away (
while taking a break to pose for the camera, of course---- and yes, we do tend to wear the same work clothes each weekend... lol):

#3 Start to Texture/Spackle Walls!
Eric texturized the master bedroom and office, so now we are ready to paint and install trim in those two rooms! We are getting so close!!! The
new air-compressor was at use --- and so was Eric:

Here is a (blurry) sample of the ceiling texture:

#4: Don fixed a small plumbing annoyance in the sink. Once again,
Yay Don!!! (he fixed it so when you run the full disposal the waste
doesn't sneak up into the left side of the sink...)

We also got to play a
little this weekend.... we took Don to
Uber (our favorite pub) and watched the
Seahawks (loose) at Paul's tonight. Eric helped me cater a work event on Friday. And, despite our house being a complete mess... we ate like king's... as usual :) it's wonderful being married to a first-class chef :)